Skip to content Skip to search Skip to main navigation

Recover App Training Guide

Mandatory Fields

Field Name

Description

Asset Type

What is the asset, e.g. unsealed road

Emergent Work Type

What treatment is required. e.g. Remove Trees and Debris

Emergent Work Details

What is the damage, e.g. ‘3x large trees and multiple branches on asset’ or ‘hangers and fallen tree limbs impacting road’

Work Team

Team or Contractors assigned to rectify

Completed Only tick yes when all works are completed

Primary Location and Location

Should automatically appear but can be searched if required

Chainage From

Should Auto populate

Chainage To

Please refresh at other end of damaged area

Lat/Lon

Should Auto Populate from submission location

Lat/Lon To

Please refresh at other end of damaged area

Damage Type

What damage is present e.g. ‘Unsealed road surface damage’

Response Type

Immediate Reconstruction within 3 months of damage or REPA works with Certified Estimate

Damage Details

Detail of damage and if possible reason for damage e.g. ‘Severe Potholes to 300m of road due to flooding’

Treatment Type

Standard Treatments as provided in the DRFA