Skip to content Skip to search Skip to main navigation

ePathway Maintenance

Tonight (Thursday 21 May) and Sunday 24 May, our ePathway service will be undergoing maintenance. During this time some online forms may not be accessible. We apologise for any inconvenience caused.

Draft Amendment C135 - South Gippsland Flood Studies

About South Gippsland Planning Scheme Draft Amendment C135

The draft amendment proposes to implement ten flood studies undertaken for catchments within the South Gippsland Shire by applying the Floodway Overlay (FO) and Land Subject to Inundation Overlay (LSIO) (see mapping), and by making other consequential changes to the South Gippsland Planning Scheme.

The draft amendment proposes to:

  • Update the Land Subject to Inundation Overlay (LSIO) for areas subject to inundation.
  • Apply a new LSIO Schedule 2 (LSIO2) to areas where road access is affected due to inundation.
  • Apply the Floodway Overlay (FO) to higher risk inundation areas.
  • Make other consequential changes to the planning scheme.

A full copy of the amendment documents is available below. This includes the explanatory report, copies of the proposed flood controls and other planning scheme clause changes as well as the flood studies.

Have Your Say

The public is encouraged to participate in the consultation process by providing feedback. Feedback must be made in writing. Submissions can be made via the survey portal until 5.00pm, Monday 6 July 2026. Submissions should clearly state the grounds on which the amendment is supported or opposed, and outline what changes (if any) the submitter wishes to make. Please note that your submission will be treated as a public document.

To provide feedback, please click the link below and select application number C135.

Provide Feedback Here

 

Find your property

Type in your address to find your property:

Once your property is found, if there are any mapping changes to flood overlays on your property the side bar will specify:

  •  what proposed controls apply and the study source (if relevant). 
  • The Proposed FO1 – Floodway Overlay Schedule 1 applies.

For detailed instructions:

Click Here