Draft Amendment C135 - South Gippsland Flood Studies
About South Gippsland Planning Scheme Draft Amendment C135
The draft amendment proposes to implement ten flood studies undertaken for catchments within the South Gippsland Shire by applying the Floodway Overlay (FO) and Land Subject to Inundation Overlay (LSIO) (see mapping), and by making other consequential changes to the South Gippsland Planning Scheme.
The draft amendment proposes to:
- Update the Land Subject to Inundation Overlay (LSIO) for areas subject to inundation.
- Apply a new LSIO Schedule 2 (LSIO2) to areas where road access is affected due to inundation.
- Apply the Floodway Overlay (FO) to higher risk inundation areas.
- Make other consequential changes to the planning scheme.
A full copy of the amendment documents is available below. This includes the explanatory report, copies of the proposed flood controls and other planning scheme clause changes as well as the flood studies.
Have Your Say
The public is encouraged to participate in the consultation process by providing feedback. Feedback must be made in writing. Submissions can be made via the survey portal until 5.00pm, Monday 6 July 2026. Submissions should clearly state the grounds on which the amendment is supported or opposed, and outline what changes (if any) the submitter wishes to make. Please note that your submission will be treated as a public document.
To provide feedback, please click the link below and select application number C135.
Find your property
Type in your address to find your property:
Once your property is found, if there are any mapping changes to flood overlays on your property the side bar will specify:
- what proposed controls apply and the study source (if relevant).
- The Proposed FO1 – Floodway Overlay Schedule 1 applies.
For detailed instructions:
Amendment documents
Ordinance changes
- Schedule 1 To Clause 44.04 Land Subject to Inundation Overlay (LSIO1)*
- Schedule 2 To Clause 44.04 Land Subject to Inundation Overlay (LSIO2)*
- Schedule 1 To Clause 44.03 Floodway Overlay (FO1)
- Clause 44.03 Floodway Overlay (FO) – State provision in Victoria Planning Provisions
- Clause 72.03 What Does This Planning Scheme Consist Of
- Schedule To Clause 72.08 Background Documents
- Schedule To Clause 74.01 Application of Zones, Overlays and Provisions
- Track Change Versions of Ordinance
*This should be read in conjunction with Clause 44.04 Land Subject to Inundation Overlay which is already available in the South Gippsland Planning Scheme.
Flood Studies
- Floodplain mapping for Hedley, 2024
- Floodplain mapping for Shady Creek, Welshpool, 2024
- Inverloch Region Coastal Hazard Assessment, 2022 (Part A)
- Inverloch Region Coastal Hazard Assessment, 2022 (Part B)
- Flood impact assessment - 421 Barry Road, Welshpool, 2021
- Flood and drainage study for Foster and Surrounding Catchments, 2019
- Floodplain mapping for Tarwin River East, 2019
- Floodplain mapping for Tarwin River West Branch, 2019
- Floodplain mapping for Fish Creek, 2018
- The Effect of Climate Change on Extreme Sea Levels along Victoria’s Coast, 2009
- Corner Inlet Dynamic Storm Tide Modelling Assessment, 2014